光澤度 | 啞光 | 耐水性 | 優 |
---|---|---|---|
干燥時間≤ | 2 h | 外觀 | 套 |
表干時間 | 2 小時 | 施工性 | 優 |
耐酸性 | 極佳 | 儲存期 | 18 月 |
每公斤涂刷面積(兩遍) | 5 ? | 單件凈重 | 5KG |
推薦施工方式:刷涂或噴涂。面漆建議用噴涂施工,漆膜效果更佳。
施工工藝:涂裝工藝(以水曲柳板為例)
耗漆量(理論值):面漆:8-10平方米/公斤(混合液,刷涂一遍的耗量)
底漆:5-7平方米/公斤(混合液,噴涂一遍的耗量)
(因基材、涂料顏色和效果不同,耗漆量會有所不同)
干燥時間(溫度25℃、相對濕度75%):表干時間小于60分鐘 實干時間12小時
可使用時間(溫度25℃、相對溫度75%):油漆混合后應在4小時以內用完。
重涂時間(溫度25℃、相對濕度75%):
如果采用濕噴濕涂飾方法,在漆膜表干以后馬上重涂,中間無需打磨。但底
漆施工4小時,面漆施工8小時后如果還要進行下步涂裝,則必須對涂層進行
打磨,以增加漆膜間的附著力。
施工注意事項:
①配漆時,將罐內油漆充分攪拌均勻,按規定比例調配,再次攪拌均勻,靜
置10分鐘后過濾使用。
②請將被涂物表面的灰塵、顆粒清理干凈,再涂飾下一道漆。
③開罐后若油漆不能一次用完則必須即時密封。
④請配套使用本公司產品,以免引起不良反應。
⑤請根據溫度的變化選擇配套的稀釋劑。
⑥基材的含水率應與當地的平衡含水率相當,表面要求干燥清潔。
⑦施工時應配戴防護用具,并保持良好通風。
⑧請根據施工難度和漆膜效果及時改變稀釋的加入量。
儲存方式:密閉存于陰涼干燥處,遠離明火及熱源。
符合國家標準:GB18581-2001
Recommended
construction method: Brush or spray. Spray paint is recommended,
the film better.
Construction Technology: coating process (as Ash board as an
example)
Consumption of paint (theoretical): finish 8-10 square meters / kg
(the mixture, brush over the consumption)
Primer :5-7 sq m / kg (the mixture, spraying over the
consumption)
(Due to the substrate, coating with different colors and effects,
the consumption of paint will vary)
Drying time (temperature 25 ℃, relative humidity 75%): dry time of
less than 12 hours, 60 minutes drying time
Can use the time (temperature 25 ℃, relative humidity 75%): paint
mixture should be used within 4 hours.
Recoat time (temperature 25 ℃, relative humidity 75%):
If the wet-jet wet coating method, immediately after the film is
dry coating weight, in the middle without polishing. But at the
end
Construction paint 4 hours, 8 hours after the finish the
construction but also the next step if the coating, the coating
must be
Polished, in order to increase the adhesion between the film.
Construction Notes:
① with paint, paint the tank, stir, according to the provisions of
the proportion of allocation, stir again, the static
10 minutes after the filter is set to use.
② Please be coated surface of the dust particles to clean up, and
then finishing the next coat of paint.
③ If the paint can that can not run out of time must be immediately
sealed.
④ Please supporting the use of our products, so as to avoid adverse
reactions.
⑤ Please select the package according to the temperature change of
the diluent.
⑥ the moisture content of the substrate should be fairly local
equilibrium moisture content, surface requires dry and clean.
⑦ construction should wear protective equipment, and maintain good
ventilation.
⑧ film according to difficulty of construction and the addition of
dilution effect of changes in the amount of time.
Storage: kept in a cool dry place sealed, away from open flame and
heat.
Meet the national standard: GB18581-2001
金剛鉆石高品位裝修漆
抗劃傷木器漆
清味裝修漆